Home // Reference // Tekniska Verken - Gärsta Verken

REFERENCES

reference list

Tekniska Verken - Gärsta Verken

15 February 2015
CountrySweden
CityLinköping
ApplicationTechnological
ProductWATER COOLED
Cooling Capacity1840kW
BuyerCaverion

Swegon, Cooling Powerplant The solution delivery consists of, two Swegon chillers OMEGA V ECHOS/COBALT W (screw compressors), producing in total 1.84 MW of cooling capacity coupled with four Dry Coolers with total cooling power of 2.3 MW. To close the loop, twelve Swegon SILVER airhandling units, to distribute the optimal climate to the power plant's process as well as adjacent office facilities. Peab is building contractor and Caverion responsible for piping, electrical and ventilation contract. Construction in progress since 2013 and is expected to be completed in the beginning of 2016. Supply and installation of cooling and ventilation made throughout the year.

Shot by Greger Ruud, Swegon AB

Ultime referenze

Privacy Policy

This website uses cookies that help us deliver our services. Cookies can be disabled in the browser settings. Do not show this message again.