On May 29th in Échirolles: delivery of a KAPPA REV 80.2 chiller (785 kW cooling capacity) to the Clinique des Cèdres. A clinic specialized in digestive, thoracic, urological and gynecological surgery and at the cutting edge of technology thanks to the use of 3D technology.
The Clinic has invested in the replacement of a cooling unit with this latest generation model, a KAPPA REV, which combines high performance and energy savings.
Our partners :
AZ ENERGIES (Installer)
MEDIACO (Handling)
Project by Jean-Serge LOUIS
A total of 700kW cooling and heating recovery chillers at Woolworths building located in the iconic Sydney Town Hall.These water cooled chil...
TAU SKY HEATPUMP WAS SELECTED DUE TO ITS SUPER LOW NOISE ON A RENOVATION PROJECT JUST BELOW THE AKROPOLIS IN ATHENS
19KW TAU Sky Hi heatpump will replace a oil burning heating system for a villa near the sea in Athens. The oil system is controlled via the ...